See on Scoop.it – Green & Sustainable News
LONDON, UK – EuroSite Power Inc., (OTCQB: EUSP) an On-Site Utility, offering clean electricity, heat, hot water and cooling solutions to hospitality, healthcare, housing and leisure centers in the United Kingdom and Europe is now operating a combined heat and power system supplying clean energy to DoubleTree by Hilton, Cambridge, UK.
EuroSite Power will produce clean energy in the form of electricity, heating and domestic hot water for each hotel at a price lower than The Ability Group’s previous and future energy suppliers. Because The Ability Group opted for the company’s On-Site Utility solution, each hotel pays only for the energy used and avoids all capital, installation and operating costs. EuroSite Power also handles all service, maintenance and repair meaning neither The Ability Group nor Hilton Worldwide need to provide manpower to support the energy equipment.
See on www.cospp.com